This job was for removal of the existing the kitchen and load bearing wall leading into dining area.
An RSJ was installed to support floor above, which was boxed in with plasterboard and skimmed over to suit existing ceiling and walls.
New kitchen units, doors and worktops were installed along with all new electrics, plumbing and a gas hob. The oven was installed into a tall oven
housing unit. An extractor hood was also fitted above hob for aid when cooking.
A new radiator was installed and a new laminate flooring laid throughout the kitchen / dining area. All was also fully decorated and finished complete with a new UPVC back door and tiling around kitchen.
This job took 3 weeks to complete due to nature of work involved. Job completed April 2015.