This job was a bathroom installation in Ferrybridge and the following took place:
Full suite removed and disposed of and new suite installed with toilet, basin and shower enclosure.
Shower tray had to be built on raised platform to allow for waste flow to main internal soil pipe. All pipe work boxed in and then tiled to hide.
All walls fully tiled and floor ply lined ready for customer to lay their own lino.
Finally, a towel warmer was installed along with a thermostatic mixer shower running off of a power shower pump installed in the tank cupboard.
Overall, a very modern design and good use of space in small bathroom.
Job was completed in May 2015 and took 7 days to complete.