This example is a bathroom Installation in a bungalow that we undertook for an elderly couple. All walls were fully tiled and the shower tray fixed to floor for ease of getting in and out.
A thermostatic shower was also installed into shower enclosure, with a towel warmer installed along with toilet and basin.
Finally, floor ply was lined and secured ready for the customer to have their lino flooring installed.
The job took a total of 2 weeks to complete from start to finish including removal of old suite and fully re-plastering the bathroom prior to installation. All new plumbing and electrics were also installed along with extractor fan too.
This job was completed in September 2013.